WWTP extension, 4250 kg/d TKN, 110 m3/h
- Increased sludge concentration and more stable influent quality needed. Introduction of big equalisation/ buffer tank, additional MBR membranes, aeration capacity and instruments, and improved supply and dosing of HCO3 adding chemicals and overall process control.
- Personal deliverables like pre-design, budget request and supplier tendering.
WWTP debottlenecking, 2000 kg/d TKN, 300 m3/h
- Increased sludge concentration and more stable influent quality needed. Introduction of additional pre-treatment, improved equalisation/ buffer tank, additional aeration capacity and NO3 recirculation and RAS capacity, and improved overall process control.
- Personal deliverables like pre-design, budget request and supplier tendering.
WWTP extension, 1850 kg/d TKN, 80 m3/h
- Additional bioreactor volume needed. Buffering for different influent qualities, influent collection/ distribution to bioreactors, step feed CAS, clarifier.
- Personal deliverables like pre-design, budget request, supplier tendering and support on execution phase with detail engineering and planning.
WWTP debottlenecking, 1500 kg/d TKN, 300 m3/h
- Capacity extension by full replacement of aeration grids with much lower specific air loading per diffuser, additional instruments, and improved process control.
- Personal deliverables like pre-design, budget request, supplier tendering and support on execution phase with detail engineering and planning.
WTP extension, drinking/process water, 110 m3/h
- Replacements and extension needed. Intake station, media filtration, buffering and new and improved automation. Add-on with hypochlorite and carbon filtration to store and distribute bacterial safe water.
- Personal deliverables like pre-design, budget request, supplier tendering and support on execution phase with detail engineering and FAT.
And many more projects like…
- Migration to PLC/SCADA setup, based on Wonderware SCADA and HIS(torian)
- WWTP improvements/energy savings, 1200 kg/d TKN
- Effluent polishing, TSS/COD compliancy, 720 m3/h
- Pre-treatment replacement, TSS/FOG removal, 15 m3/h
- Sludge dewatering debottlenecking, 20 m3/h
- Effluent reuse, 60 m3/h RO water
- Effluent polishing, TSS/TP compliancy, 4000 m3/h
- Upgrade chlorine disinfection and storage, 150 m3/h
- Process water from city and well water, 200 m3/h
- MBBR/aerobic on wash water treatment
- WFI system based on RO/CEDI for pharma
- Digester glycerine wastewater
- Advance process control and reporting on SWTP
- NF extension on drinking water
- Pilot high speed coagulation/flocculation on wastewater
- Upgrade caustic/acid storage/dosing on highest safety standards
- TDH sludge treatment SWTP
- Reuse industrial effluent for agriculture, 60 m3/h
- Replacement demin (softener, RO, CEDI)
- Upgrade WWTP fish farm, MBBR
- TDH tender for ‘energiefabriek’ on SWTP
- Disc filtration animal basins zoo
- Lake water recirculation, coag/floc/filtration treatment
- Improved effluent quality SWTP, with MBBR
- Water reuse WWTP effluent
- Pilot plant brackish water treatment for DWTP
- Pilot nitrate reduction micro electronics
- Leachate water treatment
- MBBR/disc filtration as posttreatment after anaerobic treatment. Beverage industry
- Pilot effluent polishing SWTP with disc filtration and enhanced coagulation/flocculation
- Organica Food Chain Reactor (FCR) as SWTP
- Biorotor and disc filtration on WWTP oil & gas
- CEDI and mixed bed, 600 m3/uur
- Industrial plant based on coagulation, flocculation, sand filtration, ACF and UV, 745 m3/h
- Dubbelpass RO 480 m3/h for drinking water
- Actiflo 700 m3/h for industrial water
- Nanofiltration 4×80 m3/h for drinking water
- Demin water for high pressure boilers
- Green field ultrapure water plant
- Pre-treatment brackish harbour water for process WTP